  • 网络设备综合效率(Overall Equipment Effectiveness);设备效率(Overall Equipment Efficiency);综合设备效率

例句

Support employee to improve production line OEE, increase equipment availability, reducing equipment failure.

指导下属不断提高设备OEE水平提高设备运转降低设备故障

For assembly and test factories, OEE (Overall Equipment Effectiveness) is a key index to measure production management and financial cost.

研究设备综合效率提高产能为了提高资本利用率最终体现产品成本降低

scheduling and dispatching. . . must be developed to improve equipment OEE and extendibility.

必须探索发展生产调度分派技术改进装备利用率提高工厂扩展*

Develop, research to improve production equipment capacity and OEE, ensure production plan completion.

开发调研设备改进设备生产能力确保产品计划投入生产

Meanwhile equipment downtime is the primary factors with OEE analysis of equipment efficiency losses.

使用OEE分析设备效率损失设备停机时间首先关注因素

Responsible for BPR, OEE's data collection and file, supply related stas. for process and facility improvement.

负责BPROEE收集整理数据统计提供相关数据进行工艺设备改进

Coordinate actual NEE% Vs OEE Model alignment; make gap analysis and drive improvement action plans.

负责OEE模型实际NEE结果进行对比分析推动改良计划及其实施

Coordinate TPM and OEE system with Headquarters concerning productivities improvement.

配合总部维护TPMOEE系统提高生产力

Improve and maintain OEE & reports, manage and maintain the basic tool information.

优化维护OEE及其报表管理维护设备相关基本信息

Generate preventive maintenance programme to ensure good OEE.

制定预防维护系统确保OEE

OEE = How do I utilize my resources (Capital, people, energy. . . ) ?

如何运用资源资本人力能源…)

Acquisition of line data for calculation of the OEE and the technical efficiency according to DIN standards.

采集生产线数据用于OEE总体设备效率DIN标准技术有效计算

Assist other Dept. to improve technology, yield, output, OEE, etc.

协助其他部门改进工艺产量OEE指标

Support the work of production line, improving the OEE.

配合生产线工作提高设备运转

Coordinate the work of production line and improve the OEE.

配合生产线工作进步设备运转

OEE calculation in regard of produced quantity.

产出进行OEE计算

Coordinate OEE. Set up some guideline for each production area and have a regular review meeting.

协调OEE工作建立一些指导文件日常回顾会议

8 Losses in OEE Planned Downtime The time the machine is down due to planned schedules or contractual breaks. Breakdowns OEE

8损失计划停机由于计划合约内容导致设备停机

the operational bottle-neck can be found by multiplying the rated running speed by OEE

通过额定生产速率OEE相乘获得实际瓶颈设备

Here is an example on how OEE is figured for a critical piece of equipment

下面针对关键设备OEE计算方法

Here are some additional ways to think about OEE in a variety of equipment settings

以下更多不同设备设置情况思考OEE方法

Construction OEE Models for Single-Plant's Data Analysis

单机设备OEE数据分析模型建立

Diagnosis and Improvement of Enterprise's Equipment Effectiveness Based on OEE

基于OEE企业设备效率诊断改善

Report system to show machine OEE, scrap rate, and many kinds of production figures;

各种报表展示设备综合效率报废以及各种生产数据