tailwater

tailwater

美  英

  • n.尾水渠;尾水位;顺水;下游
  • 网络下游水

英汉解释

n.
1.
尾水渠
2.
尾水位
3.
顺水
4.
下游

例句

In this paper, the design scheme and calculation method of tailwater gate hoist bridge at power station in river channel was introduced.

简要介绍了黄河沙坡头水利枢纽工程河床电站尾水门机桥的设计方案和计算方法。

The tailwater damping well for the Three Gorges underground power plant is built in narrow space with high safety risk.

三峡地下电站尾水阻尼井具有施工环境小、安全隐患大、施工工期紧、过流丽质量要求高等特点。

Hydraulic turbulence calculation for tailwater tunnel system with a sloping ceiling shared by two units

双机共变顶高尾水洞系统水力干扰分析

Special considerations for removing a tailwater surge chamber from the waterway system in a pumped-storage plant

抽水蓄能电站输水系统取消尾水调压室研究

Transient flow calculation for sloping ceiling tailwater tunnels and their body-type design for hydropower stations

水电站变顶高尾水洞瞬变流计算及体型设计

Analysis on origins of tailwater level increase and benefit of Liujiaxia hydropower station after tailrace debris removal

刘家峡水电站尾水位抬高的原因及清渣后效益分析

Exploration of correction measures to scour hole near the right bank of tailwater of Wujiangdu Hydropower Station

乌江渡发电厂尾水右岸冲坑治理措施的探索

Discussion of Tailwater as a Resource in North Municipal Sewage Treatment Plant

北方城市污水处理厂的尾水资源化探讨

The Design of Tailwater Gate Hoist Bridge at the Power Station in River Channel of Shapotou Water Control Project

黄河沙坡头水利枢纽工程河床电站尾水门机桥设计

Design characteristic of hydraulic structure for powerhouse with high tailwater level

高尾水位水电站厂房水工结构设计的特点

Design and Construction of Synovial Membrane for Second Stage Concrete at Tailwater Gate Groove in Left Bank Power House of the Three Gorges

三峡左岸电站厂房尾水门槽二期混凝土滑模设计与施工

Probing into Technical Reform Scheme for Tailwater Power Station of Zhangping Thermal Power Plant

漳平火电厂尾水电站技改方案探讨

Design for the Tailwater Discharge System of Shaoxing Wastewater Treatment Plant

绍兴污水处理厂尾水排放系统设计

Concrete lining construction for tailwater tunnel

尾水隧洞衬砌混凝土施工

Configuration Design of Wide-Shallow Tailwater Channel

宽浅式尾水渠体型设计

Calculation on Hydraulic Transition Process of Tailwater System of Underground Power Station

地下电站尾水系统水力过渡过程计算

Inverse analysis for tailwater control in hydraulic model tests

水工模型试验中尾水控制的反堰流分析

Stability analysis of No. 2 Compound landslide on the right tailwater bank of Ankang Hydropower Station

安康水电站尾水边坡2号复合滑坡体稳定分析

Prevention and control of liner concrete crack at tailwater tunnel

尾水隧洞衬砌混凝土裂缝预防及治理

Numerical simulation of impinging jet in tailwater

尾水河道冲击射流数值模拟研究

Discussion on layout of tailwater building in SHP station

浅议小型水电站尾水建筑物布置设计

Prevention and control of incipient slump damage at opening block of No. 2 Tailwater tunnel

尾水2#隧洞洞口段坍塌隐患防治

Tailwater level of hydropower station;

水电站厂房尾水管出口处的水面高程。