tgp

tgp

 英

  • 网络白芍总苷(total glucosides of paeony);白芍总甙;帕夫林

例句

The paper has analyzed the dynamometer monitoring result of high slope anchor cable of TGP double-line five-grade ship lock.

本文三峡工程线船闸边坡测力计监测资料进行分析

The flood control benefit of the TGP is the greatest contribution to the improvement of the eco-environment in the middle and lower reaches.

三峡工程防洪效益长江中下游生态环境得以改善最大贡献

This paper researches the reasons of TGP s banquette slumping during river closure by the Catastrophe theory and Self organized criticality.

突变理论组织临界性理论三峡大江截流坍塌机理进行研究

The TGP is scheduled to expire at the end of this year, leaving solar projects high and dry.

TGP预计今年年底到期届时太阳能发电项目再次陷入无助困境

Objective To observe the effect of total glucosides of paeony (TGP) combined with methotrexate (MTX) on rheumatoid arthritis (RA).

目的观察白芍TGP联合蝶呤MTX治疗类风湿关节炎RA疗效

With water extraction and gel filtration purification, a kind of polysaccharide protein conjugate, TGP(Tea Glycoprotein), was prepared.

用水提取茶叶采用纯化茶叶分离得到一种多糖蛋白复合物TGP

It took nearly 100 years from conception, demonstration, design, construction and operation to final completion of TGP.

三峡工程构想论证设计建设竣工全面投入运行历时百年

The unsteady changes of seepage field of slope of TGP ship lock under raining and percolation are analyzed by saturated seepage model.

采用饱和渗流模型降雨条件三峡船闸边坡渗流稳态变化情况进行分析

We observed the sheet-like processes typical morphology of DCs stimulated by TGP.

细胞TGP诱导刺激细胞形态越发典型

By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed.

应用声波地震三峡工程基建基岩进行现场检测

It is proved that one year ahead of the original schedule for the third-stage engineering construction of TGP is feasible.

最后结果表明三峡工程施工提前可行

Research on properties of wet-ground fine cement slurry used for foundation grouting of TGP under high pressure

三峡工程基础灌浆高压湿泥浆性能研究

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

三峡工程水电站压力管道技术结构型式选择论证

Prototype observation on navigation hydraulics in diversion channel of TGP during construction period and its verification on model

三峡导流明渠施工通航原型观测模型验证

Hydraulic calculation for TGP second stage cofferdam construction during flood period and its actual verification

三峡工程围堰截流汛期水力学计算

Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of TGP

三峡工程大江明渠截流期间分析

Research on installing a soft cushion layer for placing concrete surrounding the spiral case of TGP powerplant

三峡电站敷设软垫浇筑外围混凝土研究

Concrete construction technology for spiral case of TGP power source station's main powerhouse

三峡电源电站厂房混凝土施工技术

Optimization study on the length of upstream floating guide wall of TGP's shiplift

三峡升船上游导航长度优化研究

Reversion analysis of anti-shearing strength parameters of a landslide in TGP reservoir area

三峡滑坡强度参数分析

Influence of TGP impoundment on flowing time of the Yangtze river to the estuary

三峡水库蓄水长江进入河口流量时间影响

Seepage prevention wall constructed with high pressure jetting for stage I separation levee and its cofferdam at TGP

三峡船闸下游流堤施工围堰施工

Research on water temperature variation of TGP reservoir before and after impoundment and its influence

三峡水库蓄水前后下泄水温变化及其影响研究

Threat on Bank of Hanjiang River due to the Impounding Water of TGP and Its Countermeasures

三峡水库蓄水汉江堤防安全威胁防御对策

The research of the navigation and diversion in TGP channel and its numerical simulation

三峡工程明渠导流通航数值实验研究概述

Construction equipment allocation for high intensity backfilling construction of upstream separation levee of TGP

三峡上游流堤高强度填筑施工设备配置

10 Years of supervision on TGP construction of the Yangtze river

长江三峡工程建设监理10实践

Preliminary analysis of uncertainty in quantitative precipitation forecast of TGP reservoir interval area

三峡水库区间定量降水预报不确定性初探

Significant Decision for Constructing TGP--Review of Three-Generation Leaders of the CPC Showed Concern for Constructing TGP

三峡工程建设重大决策--三代领导人关怀三峡工程建设回顾

Preliminary analysis on supervision data of foundation deformation of TGP Shiplift during construction period

三峡工程升船施工期基础变形监测初步分析

Three-dimensional Nonlinear Finite-Element Analysis on Directly Embedded Spiral Case Model of TGP Hydroelectric Power Plant

三峡电站埋式结构试验模型非线性有限分析

On establishment of hydrologic and meteorological information network station of open diversion channel closure of TGP

三峡工程明渠截流水文气象信息网站建设

Analysis on additional deformation of longitudinal joint of flood release monoliths of TGP dan due to grouting

三峡泄洪灌浆后增开变形分析研究

Experimental study on navigable condition in and outside the inlet zone of approach channel for TGP temporary shiplock

三峡临时船闸引航河段通航条件试验研究

Key-Technologies Tackling on High Slope of TGP Permanent Lock and Its Effect in Design Optimization

三峡工程永久船闸边坡科技攻关及其布置方案优化成效

Preliminary analysis of resettlement supervision information management of TGP

浅析三峡工程移民监理信息管理

Flood control situation in middle and lower area of the Yangtze river after TGP completion and countermeasures

三峡工程建成长江下游防洪形势对策

Research on flow-induced vibration and its control for radial gate of TGP diversion bottom outlets

三峡导流弧形闸门泄洪振动控制研究

Design of second stage concrete placement facilities with controlled pressure and temperature for TGP power station's spiral case

三峡电站保温混凝土装置设计

Design of a conceptual model for TGP upstream approaching channel

三峡枢纽上游航道模型试验装置设计

热门查询