wbm

wbm

 英

  • 网络管理(Web-Based Management);西文生物医学文献数据库

例句

When you use WBM to model a process and you want to transform the process into a BPEL process, consider the granularity of each task.

使用WBM流程希望流程转换BPEL流程仔细考虑每个任务粒度

You can include all the unavailable element types listed above into your process as long as you are in the WBM Basic mode.

只要采用WBMBasic模式可以上面列出所有不可元素类型包括流程

Browse to the project interchange exported from WBM, to be compared with the current version of the WID module.

浏览WBM导出项目交换文件当前版本WID模块比较

If the changes to the BPEL do not significantly change the flow of the model in WBM, it is best to make the changes directly in WID.

如果BPEL更改并不大幅度更改WBM模型最好直接WID进行更改

Synchronize Changes: The integration developer synchronizes the changes between the current WID module, and the PI imported from WBM.

同步更改集成开发人员当前WID模块WBM导入PI之间同步更改

For major changes to a business process, the BPEL model should be re-generated from WBM and imported into WID.

对于业务流程重要更改应该WBM重新生成BPEL模型导入WID

To transform the processes into BPEL process skeletons, model the business process in the WebSphere Process Server editing mode in WBM.

为了流程转换BPEL流程框架WBM使用WebSphereProcessServer编辑模式业务流程

Analyzing Changes in WBM: The business analyst analyzes the changes and manually updates the business process model.

WBM分析更改业务分析师分析更改手动更新业务流程模型

This section will illustrate the steps required for synchronizing WID module with the WBM model by exporting the change report.

小节通过导出更改报告展示同步WID模块WBM模型步骤

Note: For best results, business analysts should identify reusable business tasks, and then create those tasks as Global tasks in WBM.

注意为了获得最好结果业务分析人员应该确定可重用业务任务然后WBM这些任务作为全局任务创建

This section goes through the steps to perform the changes required on WBM model by analyzing the change report.

小节通过分析更改报告介绍执行WBM模型需要更改步骤

After making the changes, he exports the WID project interchange from WBM as shown in figures 5, 6.

修改完成WBM导出WID项目交换文件5、6

This article describes lessons learned for modeling, assembling, and deploying business processes using WBM V6.

本文说明获得有关使用WBMV6进行业务流程建模组装部署经验教训

This article describes best practices for modeling, assembling, and deploying business processes using WBM V6.

本文说明有关使用WBMV6进行业务流程建模组装部署最佳实践

In this section, a simple model will be built in WBM. This model is composed of one simple task.

这个小节WBM创建一个简单模型这个模型包含一个简单任务

The business analyst starts to make updates to the WBM model based on new requirements from the customer.

业务分析师根据客户需求WBM模型进行更新

Create WBM Model: In this stage the business analyst models the process in WBM based on the requirements.

创建WBM模型这个步骤业务分析师根据需求WBM流程

Figure 7 shows the Event Group for the default wbm_GlobalHTMM monitor model.

7展示默认wbm_GlobalHTMM监视器模型EventGroup

Do this in WBM by using global processes.

通过使用全局流程WBM完成工作

In this section, The project interchange that is exported from WBM will be imported in WID.

这个小节WBM导出项目交换文件导入WID

Use WBM to model and simulate that change and then generate the BPEL for that process

使用WBM模拟更改然后流程生成BPEL

This article described some best practices, gaps, and lessons learned during process modeling work using WBM V6. These include

本文介绍使用WBMV6进行流程过程总结最佳实践发现差距以及获得经验教训

Study on Techniques of Non-damaging Solidification of Waste WBM in Tarim Oilfield

塔里木油田钻井无害固化技术研究

Supporting process dependencies in WBM

WBM支持流程依赖关系