adit

adit

美 ['ædɪt]  英 ['ædɪt]

  • n.【矿】横坑;入口
  • 网络坑道口;平硐;平洞

词形变化

复数:adits  

英汉解释

n.
1.
【矿】横坑,平峒
2.
入口

英英解释

n.

例句

a tunnel horizontal to the surface leading to a mine is called an adit.

与地表平行通向井下的坑道是平峒。

Adit Ginde of the University of Colorado Denver, one of the researchers, said in a statement.

丹佛科罗拉多大学的研究人员博士艾迪·金德在一份声明中说道。

Window of such an adit pants and T-shirts indicate that people live here.

一个洞穴的窗户。裤子和衬衫表明这里有人居住。

The results are helpful for designing and construction of intersection of main tunnel and adit in major highway tunnel.

研究结论对长大公路隧道设计、施工横通道,有一定参考价值。

With the progress of the mining operation in Lanjian Iron Ore year on year the effect of blasting vibration on safety of adit is increasing.

随着兰尖铁矿采场水平逐年下降,爆破震动对平硐的安全影响日益突出。

The effect of the blasting of production on main transported adit was analyzed at Nanfen Iron Open-pit Mine.

分析了南芬露天铁矿生产爆破对主运输平硐的影响。

The development systems are the adit and pass above 4100m level, and underground shaft under 4100m.

4100m以上选用平硐溜井开拓系统,4100m以下选用盲竖井开拓系统。

Control of the Side-pressure in Strike-adit and its Reinforcing Measures

沿脉巷道侧压控制及加固措施

Underground Excavation Conversion Technology for Entering Main Construction through Subway Large Adit

地铁特大风道进主体暗挖施工转换技术

Effect of Blasting Vibration on Stability of Adit of Dirt Haul and Its Comprehensive Regulations

爆破震动对废石运输平硐稳定性的影响与综合治理

A Feasibility Study on Prolonging the Service Life of the 290 Level Adit in Nanfen Surface Mine

南芬露天矿延长290平硐服务年限的可行性研究

Study on tunnel construction mechanics at intersection of horizontal adit and major tunnel in highway

公路长隧道与横通道空间斜交结构施工力学研究

TBM roadway ripping machine used in adit construction

TBM岩巷掘进机在平峒施工中的运用

Research on Allowable Peak Particle Vibration Velocity for Transport Adit in Blasting in Open-Pit Mine

露天爆破运输平硐允许峰值质点振动速度的研究

Machinery and equipment in construction of the adit of Wulong tunnel

武隆隧道横洞工区机械设备的选型与配套

Building served by a ground-source heat pump system with adit water source

利用坑道水的地源热泵工程

Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area

龙滩水电站坝址区平洞结垢量的估算

Reasonable layout of adit in tunnel for water conveyance project of Dahuofang Reservoir

大伙房水库输水工程支洞的合理布局及设计

Study on the Adit Stability Under Dynamic Blasting Load

爆破动载荷下平硐稳定性的研究

Application of cable way in No. 5 Adit construction of Gaoqiao hydropower station

索道在高桥水电站5号支洞施工中的应用

Technical Analysis of Adit-pass at Zijinshan Open Pit

紫金山金矿露天采场平硐溜井技术分析

Advance-support Technique for No. 758 Main Adit in Xiaoqinling Gold Mine

小秦岭金矿758主平硐超前支护技术