backfill
美 ['bækfɪl]
英 ['bækfɪl] 
- n.(坑洞等的)回填土
- v.回填(用挖出的材料重新填回洞穴)
- 网络回填料;充填;反填充回填
词形变化
过去分词:backfilled 现在分词:backfilling 第三人称单数:backfills
英汉双解
1. | ~ sth 回填(用挖出的材料重新填回洞穴)to fill a hole with the material that has been dug out of it |
英汉解释
英英解释
例句
It is due to the viscous properties of the backfill (sand) and the reinforcement (georgia) and the interactions between them.
这是填土材料(砂土)和加筋材料(土工格栅)本身黏性及其相互作用的综合反映。
The quality of construction for backfill in earthwork is not easy to control in the rain spell .
土方工程雨期回填施工质量不易保证,是土方工程施工中较为棘手的难题。
The frequency with which the store checks to determine whether any backfill time-outs have expired.
存储为了确定是否有任何回填超时已到期而进行检查的频率。
Build up around the house. Check for backfill soil settling near the house and fill it up where needed.
房屋周围。看看房子附近是否有回填土沉降的想象,需要的话,把它填平。
If the selected server does not respond to the backfill request, the store marks that server as down and repeats the selection process.
如果选定的服务器未对回填请求做出响应,存储会将该服务器标记为down,并重复选择过程。
For more information about backfill time-outs, see the default time-outs used for backfill requests table earlier in this topic.
有关回填超时的详细信息,请参阅本主题前面提到的用于回填请求表的默认超时。
The backfill array stores this information for a specified length of time (called the backfill time- out ) .
回填数组在指定的时间(称为回填超时)内存储此信息。
Exchange checks the public folder database object in Active Directory for a preferred backfill server.
Exchange将检查ActiveDirectory中的公用文件夹数据库对象以寻找首选回填服务器。
Since nothing ruins the illusion of solid rock quite like a hollow knock, contractors often backfill cavities with concrete.
因为没有废墟空心完全一样敲在固体岩石错觉,承办商经常用混凝土回填腔。
If the replica on ExServ02 is not up-to-date, ExServ02 places the appropriate entries in the backfill array.
如果ExServ02上的副本不是最新的,则ExServ02会在回填数组中放入适当的条目。
Most deployments of Exchange do not need a preferred backfill server.
Exchange的大多数部署都无需首选回填服务器。
The time-out value that a store uses when trying to send a backfill request for data that is available in the same Exchange routing group.
当数据在同一个Exchange路由组中可用时,存储尝试发送此数据的回填请求所用的超时值。
The receiving database identifies the missing change numbers and stores them in its backfill array.
接收数据库识别缺少的更改编号并将其存储在自己的回填数组中。
The required backfill ratio can be computed for limiting surface subsidence to specified maximum values.
所需回填比率可以计算限制地表下沉到指定的最大值。
This new method for determining backfill strength can also be applied to level mining and backfill method.
所提出的方法对阶段充填采矿法充填体强度确定也具有良好的适用性。
The paper mainly introduces some quality problem in backfill method and presents some resolutions and suggestions for further discussion.
主要介绍了充填采矿法中经常出现的一些质量问题,并对解决这些问题提出一些建议和方法供大家探讨。
In most circumstances, the backfill process operates most efficiently if Exchange selects a backfill server automatically.
大多数情况下,如果Exchange自动选择回填服务器,回填过程运行的效率会很高。
Site stripping, subgrade preparation, rough and finish grading, excavation, backfill and compaction.
现场割地、地基制备、平整分级、挖掘、回填及压紧。
When steep slope-wall is used in surface mine, the road of truck-communication inner dumping can be set in the middle of pit by backfill.
当露天煤矿端帮实行陡帮开采时,汽车运输内排通路可设在采场中部回填搭建。
Against the issue, the technical research of influence and control of blasting seismic wave on backfill is proposed.
针对该问题,提出爆破地震对充填体影响与控制技术研究课题。
After the corresponding status messages arrive, the database populates the Replication State Table and, if necessary, the backfill array.
收到相应的状态邮件后,该数据库会填充复制状态表,如有必要,还会填充回填数组。
After the corresponding status messages arrive, the store populates the Replication State Table and, if necessary, the backfill array.
在相应的状态邮件到达后,存储将填充复制状态表,并在必要时填充回填数组。
If the content is still missing when the backfill time-out elapses, ExchServ02 creates a backfill request and sends it to ExchServ01.
如果在回填超时过期后仍然缺少内容,ExchSvr02将创建回填请求并将其发送到ExchSvr01。
Finally, the suitability and effectiveness of vibroflotation without backfill on silty and fine sand are discussed.
最后结合工程实例,探讨了无填料振冲法处理液化粉细砂地基的适宜性及处理效果。
Microsoft Product Support Services can provide a script that sets a preferred backfill server if your deployment requires it.
Microsoft产品支持服务可以提供一个相应的脚本,该脚本可以根据部署要求设置首选的回填服务器。
To pipe installation is complete and experience the qualified, conducted only after backfill earthwork.
待涵管道安装完成并经验收合格后,方可进行土方回填。
The collapses of backfill pillars induced by shear forces commonly occurred in mining process, resulting in the ore dilution.
充填体在开采过程中往往由于剪切滑移而产生垮落破坏,造成矿石贫化。
Construction of the main structure of the basic construction site to complete the ongoing construction of earth backfill.
施工现场主体结构施工基本完成,正在进行土方回填施工。
A systematical study is made of the stability of backfill in blasting.
对爆破动载下充填体稳定性进行了系统研究。
For more information about backfill requests, see "Backfill Requests and Backfill Messages" later in this topic.
有关回填请求的详细信息,请参阅本主题稍后部分介绍的“回填请求与回填邮件”部分。
If the missing updates arrive in subsequent replication messages during this time, they are removed from the backfill array.
如果在这期间,缺少的更新在后续复制邮件中到达,则会从回填数组中删除这些更新。
At last, the direction for research on hydraulic gradient calculation of paste backfill slurry is pointed out.
最后指出了膏体充填料浆水力坡度计算的研究方向。
Then, the mechanics and backfilling effect of foamed backfill were studied by numerical methods .
在此基础上,采用数值模拟技术,进行泡沫砂浆充填体充填采场的作用机理与充填效果研究。
We backfill, kick some leaves around, drag over a small fallen tree.
然后我们把土填回坑里,踢过来一些树叶在上面,又拖过来一棵小枯树。
The length of time that a store delays before sending a backfill request for data that is not available in the same Exchange routing group.
当数据在同一个Exchange路由组中不可用时,存储在发送此数据的回填请求之前延迟的时间长度。
If change numbers still appear to be missing, ExchServ01 waits 24 hours, and then sends an updated backfill request.
如果看起来仍然缺少更改编号,ExchSvr01将等待24小时,然后发送更新后的回填请求。
If change numbers still appear to be missing, ExServ01 waits 24 hours, and then sends an updated backfill request.
如果仍会显示缺少更改编号,ExServ01会等待24小时,然后发送更新的回填请求。
Backfill grouting is a key process during shield tunnel construction.
壁后注浆是盾构施工的关键工序。
To streamline the backfill process, Exchange 2007 stores information about missing updates in the backfill array.
为减化回填过程,Exchange2007将缺少的更新的相关信息存储在回填数组中。
The calculated results from different theory and method are greater when the backfill is higher.
填土高度较大时不同理论和方法的计算结果相差更大。